Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 56662 REL 94: 2009-001-00 EXP UC SPRING CHINOOK & STEELHEAD ACCLIMATION
Project Number:
Title:
Upper Columbia Spring Chinook and Steelhead Acclimation
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Columbia Cascade Methow 50.00%
Wenatchee 50.00%
Contract Number:
56662 REL 94
Contract Title:
2009-001-00 EXP UC SPRING CHINOOK & STEELHEAD ACCLIMATION
Contract Continuation:
Previous: Next:
56662 REL 73: 2009-001-00 EXP UC SPRING CHINOOK & STEELHEAD ACCLIMATION
  • 56662 REL 120: 2009-001-00 EXP UC SPRING CHINOOK & STEELHEAD ACCLIMATION
Contract Status:
Closed
Contract Description:
For the 2016, Upper Columbia Spring Chinook and Steelhead Acclimation Project will focus on continued development of key release locations that fit within the context of project objectives (release fish further away from know hatchery, single point releases and integrate hatchery fish with natural origin fish they are suppose to be supplementing) and conduct first time releases form Goat Wall.  Due to site restrictions within the Mid-Columbia Coho Reintroduction Program (MCCRP), Rohlfing's site will continue to only be available for the rearing of coho as part of the MC Coho Reintroduction Project.  A Nason Creek steelhead acclimation site is still in development (Powerline) and being incorporated into a project EA, expected to be completed winter '16 (Tetra Tech is the lead entity producing this document).  The Methow will continue to release spring Chinook, as a part of GCPUD mitigation for Methow spring Chinook but site location has changed to further upstream at Goat Wall.  This will be the first year of operations and based on a decision that mid-Valley wasn't far enough removed form current hatchery distribution occurring with current hatchery releases at Methow SFH and Winthrop NFH.  The intent here is to continue to gain valuable information regarding potential benefits, both biologically and from a cost perspective, of maximizing limited rearing space within the Upper Columbia (UC) region.  The treatment group will have comparable controlled release from Methow SFH.  Some of the performance metrics identified as part of YN's evaluation would be in-pond survival, release-to-McNary survival, and overall release timing/condition for each species.  A second year of acclimating up to 61,000 spring Chinook at Chewuch Acclimation Facility (AF); over-wintered at Carlton Pond on the mainstem Methow, will occur.  This is a variation of what had historically occurred with this release location in that fish had been over-wintered at Methow SFH and moved in the spring to the Chewuch AF.  A large amount of straying occurred as a result of this with approximately 40% of the adult returns form the Chewuch AF releases returning to the hatchery.  With the over-wintering occurring downstream of the Chewuch, straying may still occur but not compromise spawning composition in the vicinity of the state and federal hatcheries located in Winthrop. Acclimation would occur from mid-March through the end of April.

In addition to the on-the-ground activities, YN will be pursuing multiple site developments in both the Wenatchee (Trinity and Powerline) and Methow (Early Winters 3) for long-term implementation once the data has been summarized and accepted within the co-managers.  Initial reporting of results have been positive and this long-term implementation for both spring Chinook and steelhead would be consistent with future HGMPs as well as long-term implementation of recalculated release/production goals through mitigation discussions.  Other sites in the queue for future consideration to be vetted out for 2016 could include Gold Creek Ponds for steelhead originating from Winthrop NFH and are in discussions with USFWS on the logistics for this to occur.
Account Type(s):
Expense
Contract Start Date:
02/01/2016
Contract End Date:
01/31/2017
Current Contract Value:
$344,803
Expenditures:
$344,803

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Debbie Azure Yakama Confederated Tribes Yes Administrative Contact azud@yakamafish-nsn.gov (509) 865-5121x6334
Roy Beaty Bonneville Power Administration Yes COR rebeaty@bpa.gov (503) 230-5213
Michelle Guay Bonneville Power Administration No Interested Party mxguay@bpa.gov (503) 230-3459
Tana Hoptowit Yakama Confederated Tribes Yes Administrative Contact hopt@yakamafish-nsn.gov (509) 865-5121x6318
Cory Kamphaus Yakama Confederated Tribes Yes Contract Manager kamc@yakamafish-nsn.gov (509) 548-9413x102
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Keely Murdoch Yakama Confederated Tribes Yes Technical Contact murk@yakamafish-nsn.gov (509) 548-2206
Christopher Roper Bonneville Power Administration No CO Assistant cproper@bpa.gov (503) 230-3514
Thomas Scribner Yakama Confederated Tribes Yes Supervisor scrt@yakamafish-nsn.gov (503) 331-9850
Tybee Sheidler Bonneville Power Administration No CO Assistant tasheidler@bpa.gov (503) 230-3820
Robert Shull Bonneville Power Administration Yes Env. Compliance Lead rwshull@bpa.gov (503) 230-3962
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Update 2012 UCSCSA plan as needed for new sites towards implementation B: 174. Update of 2012 UCSCSA Plan as sites become identified as part of the implementation schedule 01/02/2017 01/02/2017
Final To Date Site List compliance for acclimation C: 165. Final site list compliance for acclimation 01/21/2017 01/21/2017
All administrative tasks fulfilled with timely quality products D: 119. Manage the UC Spring Chinook and Steelhead Acclimation Project 01/21/2017 01/21/2017
Stakeholder Coordination E: 191. Coordination of Plan with Regional Stakeholders 01/21/2017 01/21/2017
Annual report to cover activities from 2/1/16 to 1/31/17 F: 132. Annual synopsis report for 2016 contract year; developed as a technical memo or summary of findings 01/31/2017
PIT tag spring Chinook G: 158. PIT tag up to15K spring Chinook in the Methow basin for 2016 releases 10/01/2016 10/01/2016
acclimate spring Chinook spring 2016. H: 176. Acclimate spring Chinook at Goat Wall Pond 05/01/2016
acclimate spring Chinook in 2016. I: 176. Acclimate spring Chinook at Chewuch AF 05/01/2016 05/01/2016
Continued development of Powerline site J: 171. Development of Powerline acc. site for Wenatchee program steelhead 12/01/2016 12/01/2016
Continue project development of Trinity as an over-winter/acclimation site in the Chiwawa K: 171. Develop additional site in the Wenatchee for spring Chinook-Trinity 01/31/2017 01/31/2017
Development and construction of Early Winters 3 L: 171. Continue development of Early Winters 3 site for spring Chinook 01/31/2017 01/31/2017

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 2 instances of WE 176 Produce Hatchery Fish
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 158 Mark/Tag Animals
  • 2 instances of WE 171 Build, Modify, and/or Refurbish Artificial Production Facility
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 2 instances of WE 171 Build, Modify, and/or Refurbish Artificial Production Facility

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/01/2016
B 174 Update of 2012 UCSCSA Plan as sites become identified as part of the implementation schedule 02/01/2016
C 165 Final site list compliance for acclimation 02/01/2016
D 119 Manage the UC Spring Chinook and Steelhead Acclimation Project 02/01/2016
E 191 Coordination of Plan with Regional Stakeholders 02/01/2016
F 132 Annual synopsis report for 2016 contract year; developed as a technical memo or summary of findings 02/01/2016
G 158 PIT tag up to15K spring Chinook in the Methow basin for 2016 releases 02/01/2016
H 176 Acclimate spring Chinook at Goat Wall Pond 02/01/2016
I 176 Acclimate spring Chinook at Chewuch AF 02/01/2016
J 171 Development of Powerline acc. site for Wenatchee program steelhead 04/27/2017
K 171 Develop additional site in the Wenatchee for spring Chinook-Trinity 02/01/2016
L 171 Continue development of Early Winters 3 site for spring Chinook 02/01/2016